A CONTROLLED PATH FOR SEALING
Waterproofing.
For crack sealing, joint injection or a specified below-ground treatment, choose the injection connection around the sealing system and the actual water conditions.
Address the water path.
Specify the whole system.
A water-sealing detail depends on the route of the leak, substrate condition and chosen sealing material. Hardware must provide a compatible connection without compromising that repair detail.
Packers can form individual injection points. Injection-hose systems provide a planned route at construction joints and require coordinated hose, fixing and termination arrangements. Access for later injection should be considered during installation.
DETAILS TO CONFIRM
A useful starting checklist.- Location and behaviour of the water path
- Sealing material and substrate compatibility
- Access to packers or hose terminations
- Connection types and permitted working pressure
EXPLORE THE HARDWARE
Connections to consider.
These ranges are a starting point for selection. Suitability must be confirmed against the project specification and supplied component.


